NNPMaking ready…
NNP

Permits to Work

Permits for hot work, enclosed-space entry, working aloft, and electrical isolation — each requiring a hazard checklist and signed acceptance before work proceeds, with the linked risk assessment carried across.

What it does

  • Permit types for the high-risk jobs that need control
  • Hazards prefilled from the linked risk assessment
  • Signed acceptance and validity window before work starts

Built for

  • ISM Code §7 (shipboard operations)
  • SOLAS enclosed-space entry

Modern tools, proven seamanship

Ready to run a tighter operation?

See how NNP fits your fleet — your real org chart, your real equipment, your real survey schedule.